good afternoon all,
I have two insteon switch links for outdoor lighting that I tried putting on a scene for on at dusk off at dawn. I previously had one of the switches scheduled to turn and at off as specified and it worked great. installed the second switch last night and realized only one device can have the same time schedule so i put them both in a scene. i manually turned it on last night after i got the scene setup up but it did not follow the schedule and turn off at dawn.....how do I keep the scene running without manually turning the scene on and off?
Thanks
I have two insteon switch links for outdoor lighting that I tried putting on a scene for on at dusk off at dawn. I previously had one of the switches scheduled to turn and at off as specified and it worked great. installed the second switch last night and realized only one device can have the same time schedule so i put them both in a scene. i manually turned it on last night after i got the scene setup up but it did not follow the schedule and turn off at dawn.....how do I keep the scene running without manually turning the scene on and off?
Thanks
Comment